⛽
CNGbunk India Bunks & Pumps Near Me
🛡️ UPEIDA Access-Controlled Expressway Guide

Bundelkhand Expressway: Entry & Exit Interchanges, UPEIDA Toll Rates & CNG Access

Expressway Length 296 km (4-Lane Expandable to 6)
Car Toll (End-to-End) ₹620 (Full Length FASTag)
Maximum Speed Limit 120 km/h (Cars)
Connected Districts 7 Districts of UP
⛽ Master Highway Fuel Directory

Refueling on Bundelkhand Expressway?

Access all 32 verified operational CNG pumps mapped in sequential driving order with live distance milestones, operating hours, and 1-tap Google Maps navigation.

View Sequenced Stations ➔
🗺️ Live Corridor Route Map

Interactive Route & CNG Stations Map

Official highway alignment from Chitrakoot to Etawah with 32 verified operational CNG pumps mapped in sequential driving order.

Click any marker to view address & navigate

Bundelkhand Expressway Entry/Exit Interchanges & Interchange Nodes

Constructed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA), the 296 km Bundelkhand Expressway starts at Gonda village on NH-35 in Chitrakoot district and terminates near Kudrail village in Etawah district, where it merges seamlessly into the Agra–Lucknow Expressway.

The expressway provides high-speed access to 7 historically isolated districts: Chitrakoot, Banda, Mahoba, Hamirpur, Jalaun, Auraiya, and Etawah. Interchanges are strategically configured with trumpet cuts.

Interchange Name Expressway Chainage Connecting Highway District Served
Bharatkoop (Chitrakoot) KM 0 NH-35 (Varanasi–Banda) Chitrakoot
Banda Central Cut KM 48 SH-92 (Fatehpur Link) Banda
Maudaha Interchange KM 95 NH-34 (Kanpur–Kabrai) Hamirpur / Mahoba
Rath / Jalalpur Interchange KM 142 SH-42 (Jhansi Link) Hamirpur
Orai / Jalaun Interchange KM 198 NH-27 (Jhansi–Kanpur) Jalaun
Auraiya / Phaphund Cut KM 250 SH-21 (Kanpur Dehat Link) Auraiya
Kudrail Merge Interchange KM 296 Agra–Lucknow Expressway Etawah

UPEIDA Toll Charges & CNG Waypoint Strategy

UPEIDA operates closed-loop electronic FASTag toll collection with electronic weigh-in-motion sensors. Motorists refuel before entering long rural stretches.

While roadside amenities along the greenfield alignment are progressively developing, high-throughput CNG pumps are easily accessible within 3 km of the Orai (KM 198) and Auraiya (KM 250) interchanges, connected to GAIL pipeline infrastructure.

Vehicle Category Full 296 km Toll (One-Way) Per-Kilometer Rate FASTag Requirement
Car / Jeep / Van ₹620 ₹2.10 / km Mandatory FASTag
Light Commercial Vehicle (LCV) ₹990 ₹3.35 / km Mandatory FASTag
Bus / Truck (2-Axle) ₹1,995 ₹6.75 / km Mandatory FASTag
Heavy Construction Machinery ₹3,040 ₹10.30 / km Mandatory FASTag
❓ Driving FAQs & Regulations

Frequently Asked Questions

Verified statutory answers sourced from NHAI, MoRTH, and regional transport notifications.

Where does the Bundelkhand Expressway start and terminate? ▾
The expressway originates at Bharatkoop on NH-35 in Chitrakoot district and terminates near Kudrail in Etawah district, where it merges into the Agra–Lucknow Expressway.
What are the toll charges for private cars on the Bundelkhand Expressway? ▾
Private cars, SUVs, and vans pay ₹620 for the complete 296 km journey from Chitrakoot to Etawah via FASTag.
Where can I refuel CNG along the Bundelkhand Expressway? ▾
The best CNG refueling points are located at the Orai interchange (KM 198, NH-27 crossing) and the Auraiya exit (KM 250), featuring 24/7 pumps operated by Central UP Gas Limited and IndianOil.
What is the speed limit on the Bundelkhand Expressway? ▾
The official maximum speed limit is 120 km/h for passenger cars and 80 km/h for heavy commercial buses and trucks, monitored via overhead ANPR speed cameras.

🏙️ Connected Municipal City Hubs

Explore local station directories, operating hours, and authorized CGD networks for terminal cities.